Viaduct over the River Ebro on Zaragoza?s Fourth Ring Road

  • Llombart Jaques, J. A.; Revoltós Fort, J
Keywords: Balanced cantilever construction, braces, evolutionary section, external prestressing, river work.

Abstract


The Fourth Ring Road of Zaragoza crosses the River Ebro over a 396 m long viaduct on the stretch between the N-232 road and the A-2 motorway. The deck was constructed using a continuous beam of prestressed concrete divided into 5 spans that measure a maximum of 92 m. The single deck was designed for both roadways with a total width of 26.60 m. In the first phase, the central box girder of the deck was built by the cast-in-situ balanced cantilever method, whereas in the second phase the side cantilevers of the section were constructed using mobile framework that slid over the previously built core.
Published
2010-01-03
How to Cite
, L. J. J. A. R. F. J. (2010). Viaduct over the River Ebro on Zaragoza?s Fourth Ring Road. Hormigón Y Acero, 61(256). Retrieved from http://37.35.109.41/ojs/index.php/ache/article/view/31