1.
Trotin, N.; Ladret, P.; del Olmo, S. El Carrizo" bridge - Cantilever construction of a cable-stayed bridge deck using launching girders". hya [Internet]. 2015 Jan. 1 [cited 2026 Nov. 26];66(275). Available from: http://37.35.109.41/ojs/index.php/ache/article/view/1909