1.
Corres Peiretti, H.; Pérez Caldentey, A. Arch bridge over the Burguillo reservoir (Ávila) design, construction supervision and monitoring. hya [Internet]. 2001 Jan. 3 [cited 2026 Nov. 26];52(220). Available from: http://37.35.109.41/ojs/index.php/ache/article/view/321