1.
del Pozo Vindel, F.J.; Arrieta Torrealba. Three bridges built with "in situ" sucessive spans construction method. hya [Internet]. 1989 Jan. 1 [cited 2026 Nov. 26];40(170). Available from: http://37.35.109.41/ojs/index.php/ache/article/view/848