1.
Fernández Ordóñez, J.A.; Martínez Calzón. Control and analysis of the assembly of the stay bridge Fernando Reig upon the River Barxell in Alcoy. hya [Internet]. 1989 Jan. 1 [cited 2026 Nov. 26];40(170). Available from: http://37.35.109.41/ojs/index.php/ache/article/view/846