de la Fuente González, J.M.; Polanco Mad (2001) “Admissible time interval between layers in theconstruction of roller compacted concrete (RCC) dams”, Hormigón y Acero, 52(221). Available at: http://37.35.109.41/ojs/index.php/ache/article/view/315 (Accessed: 26 November 2026).