Llombart, J.A.; Revoltós Fort, J. (1996) “Cable stayed footbridge, to access the intake tower of the Francisco Abellán Dam”, Hormigón y Acero, 47(201). Available at: http://37.35.109.41/ojs/index.php/ache/article/view/484 (Accessed: 26 November 2026).