Fernández Ordóñez, J.A.; Martínez Calzón (1989) “Control and analysis of the assembly of the stay bridge Fernando Reig upon the River Barxell in Alcoy”, Hormigón y Acero, 40(170). Available at: http://37.35.109.41/ojs/index.php/ache/article/view/846 (Accessed: 26 November 2026).