Campo Blanco, F. (1973) “PREFABRICACION IN SITU DE VIGAS PRETENSADAS PARA LA CUBIERTA DE LA NUEVA FACTORIA MICHELIN”., Hormigón y Acero, 24(107). Available at: http://37.35.109.41/ojs/index.php/ache/article/view/1366 (Accessed: 26 November 2026).