Eilzer, W., Müller, M., Schumm, M., Romberg, M., Rodríguez Molina, R. and Gutiérrez Manzanedo, F. (2022) “Replacement of the cable-stayed bridges over the river Rhine in Leverkusen and Duisburg”, Hormigón y Acero, 73(297), pp. 23-30. doi: 10.33586/hya.2020.2390.