Ben Ahin bridge in Belgium

  • Martí, R.; Rucabado, R.

Abstract


This paper describes the main characteristics of the Ben Ahin cable stayed bridge, built on scaffolding parallel to the Meuse River and rotated 70 degrees to it's final position, remarking the installation and supply of the Stronghold stays done by CTT S.A.
Published
1988-01-08
How to Cite
, M. R. R. R. (1988). Ben Ahin bridge in Belgium. Hormigón Y Acero, 39(169). Retrieved from http://37.35.109.41/index.php/ache/article/view/857