Torre Sacyr-Vallehermoso. Execution of structure

  • Sánchez Fernández, R. ; Rodríguez Ortiz,
Keywords: Climbing formwork, perimeter protection, tower cranes, hoists, composite supports, central core, HA-70, thermocouples, prefabricated rebars, high-rise buildings.

Abstract


Construction of a high-rise building is always a challenge, moreover in Spain where previous examples are not common. These tall buildings are located at small plots but consist of huge foundation mats, highly stressed vertical structures leading to non conventional solutions and a very great floor surface up in height. It is mandatory a careful design of the elevation systems together with logistics to best help the site works. The paper below describes the construction of SyV Tower, remarking the site organization, construction cycle and erection of singular elements, all of which has made possible the completion of the structure (from foundations to roof) in the 26 months scheduled.
Published
2008-01-05
How to Cite
, S. F. R. ; R. O. (2008). Torre Sacyr-Vallehermoso. Execution of structure. Hormigón Y Acero, 59(249). Retrieved from http://37.35.109.41/index.php/ache/article/view/74