Construction process of the 'Constitución de 1812' cable stayed Bridge over the Cadiz Bay

  • Lucas Serrano, C.; Martínez Cutillas, A.
Keywords: Construction sequence; Cable-stayed deck; Balanced cantilever; Segment

Abstract


Balanced cantilever method has been use to erect the cable-stayed section of the Constitución de 1812" bridge over Cadiz Bay. Standard segments are 20 m long and 34 m width and weigh 4.000 kN.The construction sequence has been determined by the ultimate resistance of the tower that must resist the unbalanced bending moments at both sides of the tower."